TACP have been commissioned to carry out a feasibility study and subsequently implementation of a new construction and engineering based facility for Coleg Cambria at their Bersham Road site.

The existing facilities needed enhancement to meet current expectations and expansion of the educational curriculum. The challenge will be retaining as much of the site in education during the works through enabling works and phasing.

Currently the project is being developed with intense dialogue with the College to ensure all requirements including for future development and expansion are being integrated into the design. The project will include facilities for – Welding / Metalwork, Wood-working, Bricklaying, Plastering, Floor-laying, Decorating, Electrical, Plumbing and Auto-Mechanics.